The doors are on with new locks and the sill was replaced!!
The master bedroom, master bathroom and Trevor's bedroom are all scraped!!! We still need the living room(about 1/3 of the way done), dining, Aubrey's room, hallway and other bathroom.
We primed the living room and had it painted and OMG what a world of difference. It looked great the brightness was amazing to me.
Then I get a call from Jeff the wall is waving. He took the walls off and they flattened out. So Im thinking that because the moisture and where they were locked down it buckled. So hopefully tomorrow we can just pop the two pieces we took off back on and they will all be flat. If not we will remove them and put them in the master bedroom where we would have to replace ALL the walls. They are nasty wood paneling by the way.
Clean Fridge DONE!!
The bathroom is also gutted and waiting for my brother in law to come and plaster.
Tomorrows I have to figure out the living room and paint the dining room and Trevor's room.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment